Hi, new to this forum, hoping to find an answer. I just had my pool re plastered new cool deck and new coping. My problem is with the fill hole. Prior to the replaster the water came through a PVC type pipe into the pool. The company that we used for the plaster did not put one in. Should that be a concern? They said it was grouted but I don’t believe that because on the last day they were here, one of the guys had to drill the hole bigger. As it is, the are now here redoing the coping, the tile and spacers they put in because they did a horrible job. I could go on and on, but I think I’m almost satisfied with the repairs so far, besides the fill hole issue.