Hi all, getting things lined up for the summer. Would appreciate some thoughts on this idea. My opening date usually varies depending on life and travel. I was thinking maybe, leave cover on now, but pull plugs and run my equipment in circulate, and put in 12 percent chlorine until I'm ready to open. Thinking this would keep any green algae growth a bay and dead stuff should be at the bottom when I open the pool in a month or so.
Or am I just wasting my time. I'd say the time effort and cost is minimal and is stuff I have to eventually do anyway with the pump, etc.