Hello,
I just finished digging out the Sod and creating a nice levelled dirt area where my AGP from Bestway will sit. I have 12"x12"x 1.5" thick paver stones for all the legs, but now am confused as to how deep they should be placed.
I am planning on installing a 1" Extruded Styrofoam base on top of the dirt. so my question is should my paver be levelled with the dirt or should i just dig down 1/2 so that the paver is levelled with the foam ?
Or doesn't make a difference, and my pavers should be levelled with the dirt, because the increase in height of 1" on the base wont matter
Thanks in advance, this is my first pool install attempt, and am also building a deck around it. if it all works out and ends up being something we use, we will be going bigger in the next few years as kids grow.
I just finished digging out the Sod and creating a nice levelled dirt area where my AGP from Bestway will sit. I have 12"x12"x 1.5" thick paver stones for all the legs, but now am confused as to how deep they should be placed.
I am planning on installing a 1" Extruded Styrofoam base on top of the dirt. so my question is should my paver be levelled with the dirt or should i just dig down 1/2 so that the paver is levelled with the foam ?
Or doesn't make a difference, and my pavers should be levelled with the dirt, because the increase in height of 1" on the base wont matter
Thanks in advance, this is my first pool install attempt, and am also building a deck around it. if it all works out and ends up being something we use, we will be going bigger in the next few years as kids grow.