- Mar 28, 2007
- 279
- Pool Size
- 13000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-40
I'm in Southern California and my pool got a lot of dirt and ash dumped on it from last week's wildfires. The CH has been rising steadily from about 200 when the pool was filled in March to 500 about 6 weeks ago. My most recent test was 900. Granted, this was done by the young kid at my local Leslie's, but I presume it's accurate to +/- 100 ppm.
He mentioned something about waiting until the spring to do a drain and fill. Does this make sense? What are the consequences of high CH?
Other numbers:
CL ~6-8 ppm
CYA 60
TA 80
pH 7.7
TIA
He mentioned something about waiting until the spring to do a drain and fill. Does this make sense? What are the consequences of high CH?
Other numbers:
CL ~6-8 ppm
CYA 60
TA 80
pH 7.7
TIA