I know it's late in the season (at least in Kansas) but I dig the hole Wed of next week and am installing the pool. I figure it will take a couple days to get all the plumbing, electric done. I need to know what I need for start up/first fill. The pump/filter etc should arrive next Monday so where do I start?
I know I need a test kit and will order one tonight, since this is a salt water pool the calculator says 261lbs of salt (Really??!!) I was considering using Mineral springs Beginnings for the first fill since we will basically fill the pool with water then have to close within a week due to cold. I am looking for the simplest and cheapest(the pool wasn't free
) way to fill and be on track for next spring. The kids may be brave enough to swim in 50 degree water the first couple of days but not likely.
Thanks for any help
Ron
I know I need a test kit and will order one tonight, since this is a salt water pool the calculator says 261lbs of salt (Really??!!) I was considering using Mineral springs Beginnings for the first fill since we will basically fill the pool with water then have to close within a week due to cold. I am looking for the simplest and cheapest(the pool wasn't free
Thanks for any help
Ron