So I bought this combo containing a new pump, pre-filter, filter, and SWG.
I’m a bit stuck on what’s the best way to plumb these considering all the parts are sized for 2” pipes and I have 1.5”
The manuals say not to have a larger diameter pipe on the return side than is on the suction side, otherwise this would be MUCH easier.
I don’t want to permanently glue a reducer to the supplied slip fittings as one day (when I redo the pool deck in 5-10 years) I’d like to size up and move the pool plumbing as well.
I can’t think of a way to do this without it looking absolutely ridiculous having unions before and after each piece of equipment.
Picture shown Is my supply line that probably also needs to be redone, yet looks terrible and it gonna be a pain to re-do cause it’s all couplings.
is this doable or should I just try to hire a professional?
Thanks and sorry for the wall of text.
I’m a bit stuck on what’s the best way to plumb these considering all the parts are sized for 2” pipes and I have 1.5”
The manuals say not to have a larger diameter pipe on the return side than is on the suction side, otherwise this would be MUCH easier.
I don’t want to permanently glue a reducer to the supplied slip fittings as one day (when I redo the pool deck in 5-10 years) I’d like to size up and move the pool plumbing as well.
I can’t think of a way to do this without it looking absolutely ridiculous having unions before and after each piece of equipment.
Picture shown Is my supply line that probably also needs to be redone, yet looks terrible and it gonna be a pain to re-do cause it’s all couplings.
is this doable or should I just try to hire a professional?
Thanks and sorry for the wall of text.