I had to dig up and replace a section of flexible PVC return line that had collapsed and pinched on top a rigid line. Hole is about 2'x2' and 18" deep. Should I just toss the dirt back in there or is sand or pea gravel better?
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.
Welcome to TFP! For a wealth of pool care information please check out our free Pool School. If you are in need of specific help then we encourage you to Register and ask us here in the forum!