Hi all, I am about to level the ground and install a 24' Steel Wall AGP. I had the sand delivered and I have rental for a bobcat and laser level booked. I'm fairly confident I can get the ground level, along with my father-in-law that has worked in construction. What we are trying to figure out is if we will need a retaining wall for the 18" high side or can it be tapered?
I've gone through about 10 pages of forum posts and most that I can find are around 30+" high sides, I can't find anything closer to mine.
Any opinions or information regarding this would be a huge help.
I've gone through about 10 pages of forum posts and most that I can find are around 30+" high sides, I can't find anything closer to mine.
Any opinions or information regarding this would be a huge help.