Remove range, dishwasher to floor under them. Measure well to get as not to have a narrow boards at the finish end. Work out of a few boxs at a time. Stagger the joints by at least 6" and keep checking field as you go. You don't want seams to line a board or two apart. Check each board before installing. I set each board, tapped in place for a tight fit in both directions, length and butt end. Stand on the field and board your nailing (stradle nailer). This keeps it pushed down when nailing. You have to start the job and end off with finish nails. The nailer won't work for the first and last foot or so (wall interfernce).
Did an addition kitchen, dining room in hardwood. Just finished 800sf laminate/interlocking.