first off im a long time lurker first post i had a new liner installed today so i tested my fill water here are results
fc 0
ch 700
ta 190
ph 7.2
i plan on installing a swg my plan is to fill the pool with my hard water enough to get liner set about 12000 gals i measured and have just over 4gm at hose about 250gph which should take about 48hrs now the rest i will fill with water that is softened i can get 1000 gals of soft water per regen doing 2 regens per day i can get 2000 gals per day so the remaining fill will take 9 days hoping to get ch around 300 which i know is still very high my question is i know i need to treat water during this period but what should i be paying attention to most my thoughts were to just keep fc high and wait till pool is full to adjust others does this seem right
fc 0
ch 700
ta 190
ph 7.2
i plan on installing a swg my plan is to fill the pool with my hard water enough to get liner set about 12000 gals i measured and have just over 4gm at hose about 250gph which should take about 48hrs now the rest i will fill with water that is softened i can get 1000 gals of soft water per regen doing 2 regens per day i can get 2000 gals per day so the remaining fill will take 9 days hoping to get ch around 300 which i know is still very high my question is i know i need to treat water during this period but what should i be paying attention to most my thoughts were to just keep fc high and wait till pool is full to adjust others does this seem right