Hi,
I got my pH at 7.5 and CYA 35, so I'm going to start SLAM. Never having done this before, I plan on adding 3 jugs of bleach (FC=1 to FC=14) and re-checking an hour later. I will be doing this after work, so I have about 4 hours until dark....My question is, how much do I have to stay on top of any chlorine dissapation? If I'm constantly adding bleach to maintain the shock level, do I have to keep doing it into the night, or will the effectiveness of what I did remain until the next day....I'm really trying to understand how important the timing is. The pool water is very clear, but I have very little FC (the water barely turns pink when adding the FAS/DPD powder)
Thanks
20000 gal
Vinyl Liner
DE Filter
I got my pH at 7.5 and CYA 35, so I'm going to start SLAM. Never having done this before, I plan on adding 3 jugs of bleach (FC=1 to FC=14) and re-checking an hour later. I will be doing this after work, so I have about 4 hours until dark....My question is, how much do I have to stay on top of any chlorine dissapation? If I'm constantly adding bleach to maintain the shock level, do I have to keep doing it into the night, or will the effectiveness of what I did remain until the next day....I'm really trying to understand how important the timing is. The pool water is very clear, but I have very little FC (the water barely turns pink when adding the FAS/DPD powder)
Thanks
20000 gal
Vinyl Liner
DE Filter