Adding chlorine for maintenance

Oct 2, 2014
72
San Marcos, Ca
I just did a 50% water change and am start the TFPC method.

My numbers this morning using the Taylor kit
FC 4
TA 100
pH 7.5
CH 260 but I have really hard water
CYA 40
CC 0

According to the pool calculator I am good where it is.

I have read the slamming page and understand that slamming is done when algae is present, FC is 0, or CC is above or 0.5. What I can't find is how to add chlorine to maintain the FC level. I am using 12% liquid chlorine. Do I just add a little chlorine each day and see how much it takes to maintain FC in the 3-7 range recommended by the pool calculator given my CYA?
 
Yes. Test the FC level, enter that in the now column. Confirm the target column is what you want and add that amount of bleach.

You likely need to be testing daily, then maybe every other day once you know the pool.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.