Just purchased new var speed pentair pump to replace my single speed pentair that died from chameleon intrusion!! I currently have a mechanical timer that controls both my aqua rite and my pump, since my new var speed pump has built in timer i need a constant hot connection. My plan was to move the pump load wires over to the hot leads inside the timer, then run the swg within the pump timers run time. ie. pump on 12 t0 6 and set the swg in the mechanical timer on from 1 to 6. does this sound reasonable? Thanks