We just assembled a 15X31 portable pool. 3" top rails -- HEAVY and hard to assemble. (Oh, I don't want to have to take it down, or empty our well refilling it!) It is about 1/2 way full and, even though we paid to have it "professionally" levelled, it is 2 1/2" - 3" deeper on one end.
I'm so very frustrated. We have had delay after delay with the levelers, with pool delivery, with needing to have several extra people available for assembly, and now to start all over? We live in Pacific NW, so swimming season is about over. I have 5 kids going to be very unhappy. (Thanks for letting me vent!)
Anyone with experience, good or bad, please advise on how level the pool really has to be. I don't want to jeopardize pool integrity, and I'll start over if I must, but if there's any tolerance to small grade, I'd sure love to hear that!
Elyn
I'm so very frustrated. We have had delay after delay with the levelers, with pool delivery, with needing to have several extra people available for assembly, and now to start all over? We live in Pacific NW, so swimming season is about over. I have 5 kids going to be very unhappy. (Thanks for letting me vent!)
Anyone with experience, good or bad, please advise on how level the pool really has to be. I don't want to jeopardize pool integrity, and I'll start over if I must, but if there's any tolerance to small grade, I'd sure love to hear that!
Elyn