Getting ready to have installed a 16x35 Viking fiber glass pool. My PB wants to have the concrete bond/overlap decking poured within 5 days of installing the pool. Spoke with a contractor today about installing a retaining wall near the pool and he brought up a very good point: Doesn't the sand/backfill need to settle before a concrete deck is poured??? I plan on calling the PB on Monday to ask, was wondering every one elses thoughts/experience.