so, getting excited. We are going this week to order pool (Desert Spring 16x32 with deep end) and PB said he should be able to get us up and running towards end of May. Says 3 days from dirt to pool!
he has a transfer pump and we will of course transfer 6400 gallons of perfectly balanced pool water from our current pool.
my CYA level is 50 in this pool (im keeping on the high side due to direct sunlight all day long).
Being that the new pool is ~20000 gallons (its hard to calculate an ABG pool with 7 ft deep end, without its 17800, so im thinking around 20000 with deep end)
soon as he transfers the water over and we start filling up, im dropping in a "stabilizer sock" to start getting CYA up ASAP
can I assume an initial CYA of ~16 since my intex pool water will be diluted down 2/3rds? (6400 x 3 = 19200)
i will of course test my CYA one last time in my good 'ol intex before it gets transferred to verify its still at 50....
he has a transfer pump and we will of course transfer 6400 gallons of perfectly balanced pool water from our current pool.
my CYA level is 50 in this pool (im keeping on the high side due to direct sunlight all day long).
Being that the new pool is ~20000 gallons (its hard to calculate an ABG pool with 7 ft deep end, without its 17800, so im thinking around 20000 with deep end)
soon as he transfers the water over and we start filling up, im dropping in a "stabilizer sock" to start getting CYA up ASAP
can I assume an initial CYA of ~16 since my intex pool water will be diluted down 2/3rds? (6400 x 3 = 19200)
i will of course test my CYA one last time in my good 'ol intex before it gets transferred to verify its still at 50....