I first will say I have been a lurker on this site for over a year now. I thought it was time to post up my pool build. This wasn't our first pool but it was the first pool build we have experienced. We started looking for builders in November 2012 and found a builder in February 2013. April 19th was the day we broke ground. I have many picutres (over 500) that document the build but will only show 37 to keep it as short as I can.
Lime stone was on the ground so the entire build was using a breaker
after two weeks of house rattling forms are up
Most of the rebar
Plumbing completed
Gunite, Texas Gray Lueders for coping, Texas mix for spa, and Marcelo putting up 6" NPT tile
Decking. We are on a PUE. The walkway and pool are right on the PUE line
Natural Concrete with salt finish
Equipment installed
Quartzscape French Gray and pool filling
Lime stone was on the ground so the entire build was using a breaker
after two weeks of house rattling forms are up
Most of the rebar
Plumbing completed
Gunite, Texas Gray Lueders for coping, Texas mix for spa, and Marcelo putting up 6" NPT tile
Decking. We are on a PUE. The walkway and pool are right on the PUE line
Natural Concrete with salt finish
Equipment installed
Quartzscape French Gray and pool filling