Currently working on an Owner/Builder pool in Maryland. Plumbing it out right now.
How deep do I really need to run the plumbing back to the pad? I was currently just going to go about 8-12", enough room for pavers + base. Is that acceptable?
Frost line is 30+" here, and I can't really imagine trenching 3 feet down. I will be blowing out all pipes in winter.