Hi all,
I closed my pool or at least have started to. I slammed pool, than added polyquat a few days later. I didn't realize it would take me so long to drain out the water to below the returns, so as a result, the pool stayed uncovered a few days longer(sunny days) than planned. When I finally put cover on, my FC was 4(cya 30, ph 7.6). Is this ok?
thanks!
I closed my pool or at least have started to. I slammed pool, than added polyquat a few days later. I didn't realize it would take me so long to drain out the water to below the returns, so as a result, the pool stayed uncovered a few days longer(sunny days) than planned. When I finally put cover on, my FC was 4(cya 30, ph 7.6). Is this ok?
thanks!