Good to know that it is fine to paint. I sent them the link to pentair that have the black skimmers. We'll see how that goes.
I am getting a price from Larry, but I am going to get a bunch of quotes on the patio work. 2000 sqft patio, so I need to shop it.
Thanks Doobs. Great process so far. Love Family pools! They said they'll cover it. I don't have a lot of trees, so it wouldn't do much. But it might make me feel better that it's slightly protected.
Coming along nicely. Can't wait to see it with the decking.
We have a 3hp Pentair variable and it dropped our electric bill by $100/month when we switched. Also went with a Aquabot instead of the Polaris sweep that helped reduce the e-bill.
Day 1 2014. We're thawed out and putting the pool house basement in. This will house all the pool equipment in a nice dry, quiet, out of sight area and give me some great seasonal storage of pool stuff.
Doobs, its progressing but going slowly. The foundation and septic inspections delayed us a bit due to a last minute septic engineering request. I am going to update one large post after the building is completely up, but before patio work starts. Probably 2 weeks away.
Just curious what the dimensions are on the "open" area part? We are thing of adding a roof and back wall to our existing shed that would look similar to this - really like the bar area! Thanks!
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.
Welcome to TFP! For a wealth of pool care information please check out our free Pool School. If you are in need of specific help then we encourage you to Register and ask us here in the forum!