Out of curiosity, is it normal for an installer to wait atleast 2 days after a good rain, to install their next pool? Are they worried about tearing up the yard or would they rather work with dirt when excavating? Or, is that BS? Reason being is that my wife is doubting their installation excuses and was wondering if something else might be going on. What do you all think?