So, I finally wrote the check and ordered the P4 (showed up in less than 2 days ).
Eventually I am adding a pool shed which is where I was planning to mount the ProLogic, but that is not built yet. I am hoping to get the SWG portion running this coming weekend, but I am not sure exactly the best way to mount the panel temporarily ... although may end up being fairly permanent if the shed is too far away from the equipment.
So, are there any codes involved as far as how to mount the subpanel on a free-standing post (which is to be added)?
I think I recall seeing that I will need to use a sheet of plywood behind the panel that is at least as large as the panel.
Is there any requirement to the type of post(s)? Metal vs. wood? one or two?
It is certainly not light, so want to make sure what I put up is legit and to code.
Thanks.
Eventually I am adding a pool shed which is where I was planning to mount the ProLogic, but that is not built yet. I am hoping to get the SWG portion running this coming weekend, but I am not sure exactly the best way to mount the panel temporarily ... although may end up being fairly permanent if the shed is too far away from the equipment.
So, are there any codes involved as far as how to mount the subpanel on a free-standing post (which is to be added)?
I think I recall seeing that I will need to use a sheet of plywood behind the panel that is at least as large as the panel.
Is there any requirement to the type of post(s)? Metal vs. wood? one or two?
It is certainly not light, so want to make sure what I put up is legit and to code.
Thanks.