Our pool builder just shot gunite. The shallow end of the pool is much deeper than we wished at about 54 inches. We had asked for 42 inches. The pool builder says this is no problem at this point, that he will simply pour concrete over the gunite to raise the depth 6 inches in the shallow end. Is there a problem with doing this? Can we bring it up 12 inches which is close to the original spec?