Guys, i really need someone to help me out here. Our first family pool is under construction and it appears that we've run into a snag.. We've had a good amount of rain over the past week and while they dug the pool out it appears that bottom keeps caving in and crumbling. Yesterday morning the Supervisor tells me there might be additional charges to bring in more gravel and or concrete, i asked how much money it would cost and he doesn't know. I come home that afternoon to find that he's brought in more gravel and apparently 8 yrds of concrete to stabilize the bottom and sides, he still doesn't have a price for me and our contract (which i never signed) says that any additional work has to be mutually agreed upon. I mean am i responsible for them digging when it was too wet or shouldn't they have planned for the rain? I don't want to be a jerk about this stuff but I'm paying 35K for a pool and to add hundreds to possibly thousands to the bottom line doesn't seem right. Has anyone had a similar case. I'm on a tight budget, if i have to pay for these changes i will most likely have to loose some of extra concrete i've planned for or the brick paver coping. I haven't signed the contract like i've stated but i have issued 2 payments.