Update....again, last post (10)
Update in post 9
We're getting a 33' agp very soon, and I contacted an installer for the ground work. They stated in the contract we would sign, that they can be up to 2" off level. I'm not sure if that is okay, or not. They did say, they try to get it as level as possible. It's just the slight chance that 2" may be all they can do, and that has me worried.
Would 2" out of level be okay? Or should I find someone else?
Update in post 9
We're getting a 33' agp very soon, and I contacted an installer for the ground work. They stated in the contract we would sign, that they can be up to 2" off level. I'm not sure if that is okay, or not. They did say, they try to get it as level as possible. It's just the slight chance that 2" may be all they can do, and that has me worried.
Would 2" out of level be okay? Or should I find someone else?