I had a 24' AGP installed 2 days ago, I watched many youtube videos on AGP installs so I was aware of the do's and dont's. The first issue I had was how they laid down bottom track in the sand and leveled, I thought the track was suppose to be leveled on the hard ground surface? second they spread 4 ton of sand (not level, just similar to walking on the beach sandy bumpy - we had a rain delay which saturated the sand pretty good, after the delay they put the wall up and by this time it was dark, instead of coming back in the am, they spread the sand with flashlights and probably spent 10 minutes spreading it they did NOT stamp the sand at all,just pushed it around with a rake, then put liner in - in the am I checked it which had 8-10 inches of water in it, I could see all of his footprints all around the perimeter of the pool, I put the ladder in and got in to check and noticed the floor was so uneven, very soft, and I even noticed a root poking the liner up enough that it would hurt someone if they stepped on it. I called then and told them I wanted the pool drained and the liner lifted and the pool floor stamped and leveled...is that too much to ask? I just dont know what to do?