- May 21, 2012
- 4
Got a few questions.
Trying to get the pool mostly in this week and this weekend.
Of course it will only be in the 90's here in Southern Indiana this weekend.
Great time to install.
We started leveling the ground last weekend.
We first used the front end loader on the tractor to get most of the dirt out of the area.
Slope is around 9 inches from low to high.
Question I have is in the process of using the front end loader, there is some lower type of spots
then the orginial low spot that we measured off. These couple of spots are in the interior of the pool area.
I still have some high spots to take out using the board and level method, but can we just fill these lower spots created
by the loader with sand when the time comes? Of course it will all be tamped down with a motorized tamper.
Thanks for the help and sorry if this has been asked before but i did go back 15 pages to check.
Appreciate the help and the forum......
Trying to get the pool mostly in this week and this weekend.
Of course it will only be in the 90's here in Southern Indiana this weekend.
Great time to install.
We started leveling the ground last weekend.
We first used the front end loader on the tractor to get most of the dirt out of the area.
Slope is around 9 inches from low to high.
Question I have is in the process of using the front end loader, there is some lower type of spots
then the orginial low spot that we measured off. These couple of spots are in the interior of the pool area.
I still have some high spots to take out using the board and level method, but can we just fill these lower spots created
by the loader with sand when the time comes? Of course it will all be tamped down with a motorized tamper.
Thanks for the help and sorry if this has been asked before but i did go back 15 pages to check.
Appreciate the help and the forum......