Hello! I have posted a few questions and many of you have responded and been so helpful. I am totally consumed by this pool build right now so I thought I would start a thread to show the progress. So far we have gunite with tile and coping to be done on Monday and concrete soon after.
The back of the house. We built that wall when we built the house with the intent that phase II would be the pool so here we are, 2 years later, building the pool!
Telling those diggers to start digging was the hardest call I have ever had to make. Seriously. I have never been so stressed in all my life. Over a stupid pool! I was less stressed building the house!
All done! There will be a 36' raised beam 18" high with 3 sheer descents. That little tail on the right is a bench seating area that will have a 30" round limestone table in the middle.
Plumbing and Steel
Gunite in process
Haven't uploaded the gunite completed picture yet. It has also been graded with electrical run. More to come...
The back of the house. We built that wall when we built the house with the intent that phase II would be the pool so here we are, 2 years later, building the pool!
Telling those diggers to start digging was the hardest call I have ever had to make. Seriously. I have never been so stressed in all my life. Over a stupid pool! I was less stressed building the house!
All done! There will be a 36' raised beam 18" high with 3 sheer descents. That little tail on the right is a bench seating area that will have a 30" round limestone table in the middle.
Plumbing and Steel
Gunite in process
Haven't uploaded the gunite completed picture yet. It has also been graded with electrical run. More to come...