We have been installing a pool since July. We have the walls installed and the pool man is trying to get the pool krete in for the floor. It is raining every day so we can not get a day to get the pool krete in. my question how dry does the pool floor need to be before we install the pool krete. Second, how long does it need to dry? The pool guy told me 8 hours to dry. The website i looked at said 48 hours. I think they may be trying to rush things since it is getting close to winter.