Have concrete inground pool being renovated. My concrete guy said since I'm doing cantilever coping they need to do pour before pool guy puts liner in. Something about forms need to attach to liner track. Is this the case? or is it just easier for him? Is it possible to install liner and attach forms to top of pool wall? worried about pouring deck before pool is run/checked for leaks. Maybe this is how its usually done. Any info would be greatly appreciated[attachment=0:2c3mzn3r]DSC01136 - Copy.JPG[/attachment:2c3mzn3r]