Previously I was thinking about getting the 2-speed pump to simplify the wiring but I really want to cut down the electric bill with VSP (has its own timer). So beside having the Aquarite timed to turn on when the VS pump is on, is there any other choice to automate this? I don't like this idea of having 2 timer because in the case of pwr outage, the Auqrite's timer will be out of line with the pump's timer.
Thanks
Thanks