Our first pool was installed on Saturday and is full and ready to back fill the dirt and add the pebble rock. They had to cut into our uneven yard about 3 ft on one side of the pool. The GC sloped the area he had to cut into to keep up from having to build a retaining wall. He advised us to continue the gradual slope all the way to the pool (I think??) and then add our pebble rock. My husband and I are clueless about this and I'm not sure if we can do this.
Does anyone have any pointers, success stories or pics they can share? Thanks guys!
Does anyone have any pointers, success stories or pics they can share? Thanks guys!