Ok, so pool was installed on Thursday. On Friday, I added one lbs shock, and diluted 1lbs CYA. The CYA took to long, so I have the other 2 lbs in a sock, over the edge. Here are my numbers:
FC - 1.5
CC or TC - 2.0
pH - 7.73
TA - 227
CH - 250
CYA - 8
It is now Sunday at 5pm. I plan to add the Muriatic Acid. They said to shut the pump off for one hour when I pour it is, then run the pump overnight. Is this how I should do it? And then any other advice is welcome. FC was about 5-6 after I had shocked it on Friday. Yesterday, it was at 3. Should I add more shock, or is that part done, and just get FC to 2-3 and keep it there?
FC - 1.5
CC or TC - 2.0
pH - 7.73
TA - 227
CH - 250
CYA - 8
It is now Sunday at 5pm. I plan to add the Muriatic Acid. They said to shut the pump off for one hour when I pour it is, then run the pump overnight. Is this how I should do it? And then any other advice is welcome. FC was about 5-6 after I had shocked it on Friday. Yesterday, it was at 3. Should I add more shock, or is that part done, and just get FC to 2-3 and keep it there?