Did a search on the topic, but most of the discussion is related to poured concrete decking.
I'm having 1200 sqft of pavers layed in a month or so and I'm trying to gather information on proper installation of umbrella sleeves. Would this be similar to a concrete surface where they are set before the pour, or would a hole need to be bored for the sleeve after the pavers are set?
I am considering using this product:
http://www.coolpoolproducts.com/shop/item.asp?itemid=3
Any insight or suggestions would be greatly appreciated
I'm having 1200 sqft of pavers layed in a month or so and I'm trying to gather information on proper installation of umbrella sleeves. Would this be similar to a concrete surface where they are set before the pour, or would a hole need to be bored for the sleeve after the pavers are set?
I am considering using this product:
http://www.coolpoolproducts.com/shop/item.asp?itemid=3
Any insight or suggestions would be greatly appreciated