Hello, I am new to the site and looking for an answer regarding my 24' AGP installation.
I purchased a used 24' round 52" wall pool last summer and almost ready to begin to put the
pool up. However, My question is in regards to installing the new beaded type liner, and using the bottom foam cove.
Do I put up the pool, lay down a 2" layer of sand (wall-wall) and then put the cove over the sand base up against the wall? Keeping in mind that the 2" sand base has covered up the bottom track so the notch on the back of the cove is useless.
Or do I, and another layer of patio blocks to my existing blocks, then put in the 2" sand base, so that the bottom cove rides along the bottom track?
52" wall height. Bead on liner is at 45" from bottom seam, and the bead receiver comes down 2" after it's installed on the wall. The math would leave me approx. 2-3" away from hitting the foam cove. PLEASE HELP WITH INFO.
I purchased a used 24' round 52" wall pool last summer and almost ready to begin to put the
pool up. However, My question is in regards to installing the new beaded type liner, and using the bottom foam cove.
Do I put up the pool, lay down a 2" layer of sand (wall-wall) and then put the cove over the sand base up against the wall? Keeping in mind that the 2" sand base has covered up the bottom track so the notch on the back of the cove is useless.
Or do I, and another layer of patio blocks to my existing blocks, then put in the 2" sand base, so that the bottom cove rides along the bottom track?
52" wall height. Bead on liner is at 45" from bottom seam, and the bead receiver comes down 2" after it's installed on the wall. The math would leave me approx. 2-3" away from hitting the foam cove. PLEASE HELP WITH INFO.