Will have my signature updated shortly...but in the mean time we just finished up with a new pool construction..~23.5k gallon gunite/diamond brite pool (will switch over to salt when everything is stabilized)
PB added a bunch of startup chemicals (metal out, super shock, etc....but no muriatic acid...and currently alkalinity level is currently around 260ppm...
I know I should be providing more but wanted to get the Alkalinity level spot on first before testing anything else...
Currently have pump on full circulation..and current Chlorine level is close to 3.0 judging from the color test...
I added 1.5 gallons of muriatic acid....how long before I can re-test the levels? I'm sure I'll need to add more but don't want to rush things...
PB added a bunch of startup chemicals (metal out, super shock, etc....but no muriatic acid...and currently alkalinity level is currently around 260ppm...
I know I should be providing more but wanted to get the Alkalinity level spot on first before testing anything else...
Currently have pump on full circulation..and current Chlorine level is close to 3.0 judging from the color test...
I added 1.5 gallons of muriatic acid....how long before I can re-test the levels? I'm sure I'll need to add more but don't want to rush things...