Hello all,
We have a small spillway from our spa to the pool. The pool was just finished and filled at the end of Jan. My issue is the stone was broken on one side and we asked for it to be replaced. The stone guy came back today to repair it and is going to cut out another small section to replace. This mean we have 22 X 18 or so opening that will have 5 sections of stone in it where there should have been 1 piece of stone. Has anyone that has had multiple pieces of stone on a spill way had issues with the water eroding the mortar? Here are a couple of pictures.
We have a small spillway from our spa to the pool. The pool was just finished and filled at the end of Jan. My issue is the stone was broken on one side and we asked for it to be replaced. The stone guy came back today to repair it and is going to cut out another small section to replace. This mean we have 22 X 18 or so opening that will have 5 sections of stone in it where there should have been 1 piece of stone. Has anyone that has had multiple pieces of stone on a spill way had issues with the water eroding the mortar? Here are a couple of pictures.