We just passed Under ground electric and pumbing, so we can move onto grading, and decking!
We picked a Tumbled Travertine coping and deck, it looks awesome in the crates! I have a few questions I hope ya'll can help out with.
We are going to be installing about 120 Linear Ft of Leonardio Bullnose Coping and about a 1100 sq ft deck Ivory Travertine.
I saw on another post about using a sealer on the bond beam of the concrete. I haven't come across that anywhere in looking into how to install Travertine coping. Anyone have experience with a travertine coping installation?
Also, I have read a lot about using Flexbong mortar at 1inch thick. Sound about right?
What is the spacing between coping pieces? 1/4 or 1/5 inch?
What is the overhang you have? We were thinking 1 - 1.5 inches....?
Travertine Mart: How to install travertine patio pavers
Here is what the coping looks like with a piece of the deck next to it. Base rocks and sand going in this week, coping done by the weekend.
We picked a Tumbled Travertine coping and deck, it looks awesome in the crates! I have a few questions I hope ya'll can help out with.
We are going to be installing about 120 Linear Ft of Leonardio Bullnose Coping and about a 1100 sq ft deck Ivory Travertine.
I saw on another post about using a sealer on the bond beam of the concrete. I haven't come across that anywhere in looking into how to install Travertine coping. Anyone have experience with a travertine coping installation?
Also, I have read a lot about using Flexbong mortar at 1inch thick. Sound about right?
What is the spacing between coping pieces? 1/4 or 1/5 inch?
What is the overhang you have? We were thinking 1 - 1.5 inches....?
Travertine Mart: How to install travertine patio pavers
Here is what the coping looks like with a piece of the deck next to it. Base rocks and sand going in this week, coping done by the weekend.