The acid wash crew added 8 bottles of start-up tech on Saturday evening. Pool was full by end of Sunday.
Fired up the pumps today, charged the filters with DE, added acid, bleach and cya.
The superintendent did a rough guess for tonight on the bleach (5 gal) and acid (4 gal).
I tested it after a few hours and got:
TA: 120
PH: 6.8
CL: 6
CYA will take around 29 lbs. We are putting it in using 3.5 pound doses on each system - gradually.
Hot tub XF closed booster circuit had a TON of dirt in it - so when we fired it up, it looked like a big bowl of mud soup. I threw a sump pump in and drained it, rinsed it, and refilled it. Crystal clear now.
The rest of the pumps we set to waste setting and blew the mud from the drain lines down backwash hoses onto the lawn before starting them up.
Some of the return lines were full of mud as well and made a pretty good dirt plume in the pool.
All in all, it seems like things are coming together ok on the start up.
The pool is still cloudy but the pumps will be running 24/7 for the foreseeable future so it should clear up in a day or two.
We brushed the walls tonight too. Probably going to fire up the robot tomorrow evening to start collecting all the debris on the bottom.