Hi! I hope this is the right board to post this under...it's more like "reconstruction" I suppose.
I am doing my first liner replacement. My old liner is a 30 mil. It seems there is a debate on mil. What are your thoughts? I live in Indiana if climate is a consideration.
I'd also like to know about the pool being empty AND the liner having been taken out. I've read to not do that until you're ready to replace. What can happen if it is left exposed with the liner out for say...2 weeks? It's steel wall with a vermiculite floor.
Thank you in advance for your advice!
I am doing my first liner replacement. My old liner is a 30 mil. It seems there is a debate on mil. What are your thoughts? I live in Indiana if climate is a consideration.
I'd also like to know about the pool being empty AND the liner having been taken out. I've read to not do that until you're ready to replace. What can happen if it is left exposed with the liner out for say...2 weeks? It's steel wall with a vermiculite floor.
Thank you in advance for your advice!