Hello all, I am building a DIY pool kit and after laser leveling the site found that my deep end wall would be exposed 36" above grade. Not a big problem with backfill but due to the slope I am forced to build about a 4 1/2 foot retaining wall 6 feet away from the pool wall and then backfill. Any thoughts from anyone or has someone dealt with this issue? I am looking to pour concrete footer and poured concrete block retaining wall running 76 feet long.