- Jul 21, 2008
- 60
Well it is spring and I am ready for a project. The dedicated line for the Vac was capped off when I got the pool so I can hook it up however I want. How exactly, do I want? =]
So, Where should I run the Vac line? The return side? The Pump side?
And how should I T it in to that line? My lines have Ts already and I will take a picture of that when I dig it up.
Also should I valve any of the lines, like the step jets for better pressure/suction?
-Nathan
image source borrowed from KenJ
So, Where should I run the Vac line? The return side? The Pump side?
And how should I T it in to that line? My lines have Ts already and I will take a picture of that when I dig it up.
Also should I valve any of the lines, like the step jets for better pressure/suction?
-Nathan
image source borrowed from KenJ