Hi!
I am completing a pool renovation (re-plastering, water line, etc.). I changed my pool to salt over a year ago (and love it) but the Pool Contractor recommends that (when re-filling the pool) I run the system on Chlorine for a couple of weeks before switching to Salt again (no specific reason beyond "That's what I've always seen & done).
I have a Hayward Aqua Plus system.
Please feed back.
Thanks!
S21
I am completing a pool renovation (re-plastering, water line, etc.). I changed my pool to salt over a year ago (and love it) but the Pool Contractor recommends that (when re-filling the pool) I run the system on Chlorine for a couple of weeks before switching to Salt again (no specific reason beyond "That's what I've always seen & done).
I have a Hayward Aqua Plus system.
Please feed back.
Thanks!
S21