We've met with several PBs and have a good idea of what we want the design to be and everything but can't help but think we're short-changing ourselves by not at least considering the O/B process. I'm not sure my wife would have the patience for it (we started the PB process back in Sep/Oct) but I'm tech-savvy enough to figure our PoolStudio and my father-in-law has an engineering/drafting background so that part doesn't scare me. Is the time frame of going O/B route about the same as going with a PB if we stay on top of things or are we going to incur a longer time frame but going down this path?
anyone (apart from JamieP) in the DFW area go down this route that we might be able to pick your brain on?
anyone (apart from JamieP) in the DFW area go down this route that we might be able to pick your brain on?