Our pool was installed this summer and within two weeks we started seeing staining all around the sides and bottom. It has gotten progressively worse over the last month and a half. We are putting in between 32-48oz of acid everyday to keep the PH at 7.4 (seems like a lot). All other chemicals levels are fine. The pool company owner came by a few weeks ago and took a plaster sample for testing, but I has not shared any results. Their communication during the whole process was poor. A plasterer will look at the pool tomorrow and the pool company project manager stated it is likely going to be a re-plaster job. What should I be asking for in terms of a re-plaster? I asked what the process was going to be and they said we will discuss after the plasterer looks at he pool. Should I expect the plaster to be removed down to the gunite or sandblast, bonding, and re-plaster. Would love to get some opinions and insights.
Pool details
17,500 gallons
Salt Water Generator
Pentair equipment
Spa
Water feature
Pool details
17,500 gallons
Salt Water Generator
Pentair equipment
Spa
Water feature