Hi All ... What a great site.
I have looked but I was unable to find a basic order of operations for a new pool.
My pool was built two days ago. Filled with new (city) water yesterday. I am trying to figure out the order / timeline for adding chemicals. I need to get this right because the kids are killing me with pressure to go swimming ..
I added 200 lbs of salt this morning with pump on and SWG off. How long does this have to run before I can test and turn on the SWG.
Then what are the next things to test for in order? Or can I do all the other tests and adjustments at the same time.
Also ... the water is new and fresh and clear. Can we swim while I am working on getting the numbers right?
Thank you for the advice
I have looked but I was unable to find a basic order of operations for a new pool.
My pool was built two days ago. Filled with new (city) water yesterday. I am trying to figure out the order / timeline for adding chemicals. I need to get this right because the kids are killing me with pressure to go swimming ..
I added 200 lbs of salt this morning with pump on and SWG off. How long does this have to run before I can test and turn on the SWG.
Then what are the next things to test for in order? Or can I do all the other tests and adjustments at the same time.
Also ... the water is new and fresh and clear. Can we swim while I am working on getting the numbers right?
Thank you for the advice