Search results

  1. K

    Hayward Goldline GL-235 Solar Controller Wiring

    The electrician was able to install the Solar Controlled with the wiring diagram I shared on the first post and it worked perfectly :)
  2. K

    Hayward Goldline GL-235 Solar Controller Wiring

    Yep. Just hired an electrician to take care of this.
  3. K

    Hayward Goldline GL-235 Solar Controller Wiring

    The booster pump can run either at 120V or 240V. I am planning to run it using 240V. Since the main questions are for Terminal 5, 6, I can hook up the Solar controller without any connects to the booster motor and test the voltages on Terminal 5, 6.
  4. K

    Hayward Goldline GL-235 Solar Controller Wiring

    I have also found two other TFP posts that discusses similar topic. I am including these just for the benefit of others who might be looking for similar information. Confused about wiring the GL-235 solar controller up for timer overide GL-235 to operate Intex SWCG pump I will definitely...
  5. K

    Hayward Goldline GL-235 Solar Controller Wiring

    Thanks for the replies. In my current setup, filter pump (1.5HP) and booster pump (0.75HP) run on the same 240V AC circuit. We have a separate circuit breaker for this AC Circuit. Although Figure 1 shows the two right terminals as High Voltage Output, Figure 4 clarifies how to connect to...
  6. K

    Hayward Goldline GL-235 Solar Controller Wiring

    Hello, This is my first post ... so please be kind. We recently brought a house that has pool with Solar heating. The setup current setup is as follows, 1) Pool timer drives the filter pump 2) When the filter pump is running, 240V is also supplied to the Solar Controller 3) Solar Controller...