Search results

  1. K

    Cost for PVC work

    I was quoted 125.00 hr plus the ball valves for 2 small pvc pieces and 2 ball joints.
  2. K

    Question on heat cycling...

    SWG and heater are all on the same switch. It all comes on together and everything runs at the same time. The heater can be turned off and not come on with the rest. When the switch is flipped off everything turns off. I do have to say one weekend we hit high 80s and even though we had the...
  3. K

    Question on heat cycling...

    We use natural gas. I typically turn the heater on Friday morning and leave it on over the weekend. It generally takes all day Friday to heat up from roughly 74 - 84 degrees. We are going through some low temps here around high 50s low 60s at night. Typically we will keep the heater on once...