The equipment surround has a 12 x 12 footing with 1/2 rebar every 18" vertical and 18" horizontal. I would bend the rebar to get curves in it. I used premix concrete on the wall and applied it with a shovel. Basically I just lobed it on and formed with trowels, plastic bags, burlap and...