So I bought a Coleman 22'x 52" and prepped the site. I laid down CR6 and stone dust to assist in leveling. I used a board with 6 foot level and thought I was good. After filling and some playing in the pool it was off 3- 3 1/2 inches. Originally it was only about 2" off but I didn't use bricks...